What We Do

Custom Crating and Asset Protection

A Raleigh August afternoon on a loading dock does more damage to sensitive freight than the actual truck ride.

Custom Crating and Asset Protection priorities

Humid subtropical summers push dock-side temperatures and dew points high enough that unprotected equipment can pick up condensation the moment it moves from an air-conditioned trailer into outside air, which is a bigger risk to a display than the road miles it just covered.

  1. Crate dimensions and cushioning built to the asset, not a stock box size.
  2. Moisture protection sized for Raleigh's summer humidity and dew point swings.
  3. Reusable crate labeling that survives multiple show cycles without repainting stencils.

Building to the asset, not the catalog

A custom crate starts with the actual dimensions, weight distribution, and fragility of what's shipping, with internal bracing designed around the piece rather than padded out to fit a standard box. That precision keeps shipping weight down, which matters once drayage gets billed by the hundredweight.

For Research Triangle Park clients shipping lab or diagnostic equipment to a Raleigh show, crating also accounts for calibration sensitivity, with foam-in-place or custom-cut cushioning that limits vibration transfer during transit.

Humidity and temperature protection

A humid subtropical summer in Raleigh routinely pushes dew points into the range where equipment moving from a climate-controlled trailer to outside dock air can fog or condense internally within minutes, which is a real risk for electronics and optics, not a theoretical one.

Vapor-barrier liners and desiccant packs are standard on crates carrying sensitive equipment during the warmer months, and storage between show dates is climate-aware rather than a bare warehouse bay.

Reusable crates for repeat shows

Crates built for a client's recurring show circuit are labeled and reinforced for repeat handling rather than a single trip, since a crate that only survives one round of freight ends up costing more over a season than a durable one built up front.

Hardware, hinges, and latches on a reusable crate get inspected between shows the same way the asset inside does, since a worn latch that fails mid-transit is a common cause of a crate opening in the truck rather than at the dock.

Crating for RTP lab and diagnostic equipment

Instruments coming out of Research Triangle Park labs for a show floor often travel with calibration records that matter as much as the hardware itself, and a crate built for that kind of shipment includes a documented handling protocol, orientation labeling, and shock indicators so a receiving team knows immediately if the piece needs recalibration before it goes on display.

Some RTP exhibitors ship prototype or pre-release equipment under the same confidentiality expectations as an embargoed product launch, which means crate labeling stays generic on the outside even though the protection inside is built to the specific unit.

Crate sizing and drayage cost

Because material handling at a Raleigh venue is billed by the hundredweight, an oversized crate built with more bracing than the asset needs adds real cost at the dock, so crate design balances protection against unnecessary bulk rather than defaulting to the heaviest possible build.

A crate sized correctly to the asset also stores more efficiently between shows, which matters for clients paying for warehouse space by the footprint rather than by the piece.

Frequently asked questions

Why does Raleigh's summer humidity matter for shipping equipment?

High dew points mean equipment moving between a climate-controlled trailer and outside dock air can develop internal condensation quickly, which is a real risk to electronics and optics and part of why moisture protection is built into the crate, not added as an afterthought.

How is a custom crate priced compared to a standard case?

Custom crating costs more upfront than a stock case but usually saves on drayage weight and reduces damage claims over multiple shows, so the comparison depends on how many times the asset ships, not merely one trip.

Can existing equipment cases be retrofitted instead of built new?

Sometimes. A case that's structurally sound but under-cushioned can be retrofitted with new foam or bracing, which costs less than a full rebuild if the shell itself is still in good shape.

How long does custom crate fabrication take?

A straightforward crate can be built in about a week; complex multi-piece crates with foam-in-place cushioning or vapor barriers typically need two to three weeks, so timing gets set against the ship date, not the show date.

Does crating for confidential or prototype equipment look different from the outside?

No, the exterior stays generic and unlabeled beyond standard handling markings, while the internal protection and documentation are built to the specific unit, which keeps the shipment from drawing attention before an embargo lifts.