A 10-by-10 or 10-by-20 inline space shares back and side walls with two neighbors, so the install sequence has to account for someone else's crew working a few feet away at the same time.

Inline Booth Installation priorities

Inline installation is the most common booth format on a Raleigh Convention Center show floor, and it comes with its own rules — height limits on back walls, sightline restrictions near neighboring booths, and a shared aisle that both crews need clear at the same time.

  1. Back wall and side rail height checked against the show's published inline height limit before build day.
  2. Install timing coordinated loosely with neighboring booths to avoid two crews fighting for the same aisle space.
  3. Graphic and structure placement kept clear of any sightline restriction near a corner or peninsula-adjacent booth.
  4. A final walk-through against the floor plan before the crew leaves, confirming booth number and orientation match the contract.

Working inside a shared footprint

An inline booth's back wall usually caps out at 8 feet, stepping down toward the aisle, with specific rules about what can extend past that line into a neighbor's sightline. Those limits are set by the show organizer, not the venue, so we check the current exhibitor manual rather than assuming last year's numbers.

Neighboring booths sometimes install faster or slower than expected, and a good inline install plan leaves enough slack that a neighbor's delay does not block access to your own space.

Corner booths and peninsula-adjacent spaces carry an extra layer of sightline rules, since they face two or three open aisles instead of one, and we check those rules separately rather than applying a standard inline back-wall spec to a corner space.

Sequencing structure before graphics

Structure goes up first — back wall, side rails, any counter or furniture — followed by graphics application once the frame is confirmed square and level. Applying graphics before the structure is fully set risks misalignment that shows on the finished panel.

AV or lighting components, where the booth includes them, go in after graphics so cabling does not interfere with panel placement.

Coordinating with the aisle and dock schedule

Inline booths depend on aisle access for material handling carts, and a crowded move-in day means that access gets contested. We schedule delivery of crates and cases against the dock's published windows rather than showing up and hoping for an open aisle.

Downtown Raleigh Convention Campus move-in days can get dense with simultaneous inline builds, so timing the material delivery a step ahead of the crowd matters more here than at a smaller regional hall.

Final check before the crew leaves

Before the install crew signs off, the booth number, orientation, and any electrical or rigging points are checked against the signed contract and floor plan. A booth built in the wrong orientation is a common and avoidable mistake that this final walk-through catches.

Any punch-list item — a graphic misalignment, a loose panel — gets fixed before the crew leaves rather than left for show morning.

We photograph the finished booth against the approved floor plan before signing off, which gives the client a record of exactly how the space looked at handoff, before three days of show traffic have a chance to shift anything.

Handling a last-minute floor plan change

Show organizers occasionally shift booth locations close to move-in, whether for a safety reason or to accommodate a late addition to the floor. When that happens on an inline space, we recheck the neighbor list and sightline rules for the new spot rather than assuming the previous location's plan still applies.

That recheck takes an hour, but skipping it risks building the booth against the wrong neighbor's boundary.

Frequently asked questions

What is the typical height limit for an inline back wall?

Most shows cap inline back walls around 8 feet, stepping down toward the aisle, but the exact number is set by that show's organizer and confirmed against the current exhibitor manual.

What happens if a neighboring booth's install runs late?

We build in enough schedule slack that a neighbor's delay does not block access to your own footprint, and coordinate directly with their crew when the aisle gets tight.

Does graphics go up before or after the structure?

Structure first — back wall, side rails, furniture — then graphics once the frame is confirmed square, since applying graphics too early risks misalignment.

How do you handle material delivery during a crowded move-in day?

Crate and case delivery is scheduled against the dock's published windows, which matters most on dense move-in days at the Raleigh Convention Center.

Are corner and peninsula booths installed differently than a standard inline space?

Yes, they carry extra sightline rules for the additional open aisles they face, so we check the show's corner and peninsula guidelines separately rather than applying the standard inline back-wall spec.