What We Do

Venue Compliance and Show Services Paperwork

North Carolina's right-to-work status changes how a labor order gets written, not whether one is needed at all.

Venue Compliance and Show Services Paperwork priorities

North Carolina General Statutes, under Chapter 95, Article 10, establish the state as right-to-work, meaning labor categories at a Raleigh venue aren't restricted to union-only crews the way they would be in some other regional markets, which changes how a show services order gets structured rather than eliminating the paperwork.

  1. Labor categories confirmed against the specific venue's published kit, not assumed from another market.
  2. Certificate of insurance filed to match the venue's exact coverage requirements.
  3. Deadlines tracked against the exhibitor kit's calendar, not the show's opening date.

What right-to-work status actually changes

Being a right-to-work state means North Carolina law doesn't require union membership as a condition of employment, so a Raleigh venue's labor categories aren't locked to a single union hall the way some markets outside the state operate. That doesn't remove the need for skilled labor for rigging, electrical, or material handling; it changes who can be hired to do it.

A show services order written for a Raleigh venue should reflect the specific labor categories that venue publishes, since a form copied from a union-jurisdiction market elsewhere will list categories and rules that don't apply here.

Exhibitor service kits, venue by venue

The Raleigh Convention Center's exhibitor kit covers material handling, electrical, rigging, and booth cleaning orders on its own deadlines, and the NC State Fairgrounds buildings publish a separate kit with different forms entirely, since the fairgrounds runs its own facility operations rather than the convention center's contracted services.

Reading the correct kit before submitting orders avoids the common mistake of filing a form meant for one venue with another, which usually means resubmitting and losing whatever early-bird discount deadline had applied.

Insurance and certificates

Certificates of insurance have to name the specific venue and, often, the show organizer as additional insured parties, with coverage minimums that vary by venue, so a generic certificate on file from a past show doesn't automatically satisfy a new venue's requirement.

Filing the certificate ahead of the deadline in the exhibitor kit avoids a booth being held at check-in for missing paperwork, which happens more often than exhibitors expect.

Tracking deadlines against the kit calendar

Exhibitor kits publish their own deadline calendar for labor orders, freight, insurance, and booth cleaning, and those dates are set against the show's move-in schedule, not the public opening date, so working backward from the wrong date is a common paperwork mistake.

Early-bird pricing on labor and material handling orders is usually tied to a deadline three to four weeks ahead of move-in, and missing it doesn't just risk a late order, it locks in the higher standard rate for every category on the form.

Signature authority and on-site changes

Exhibitor kits require a named signature authority who can approve labor orders and change requests on-site, and that person's contact information has to be on file with the venue before the show opens, not handed over verbally at the labor desk.

A change to a labor order placed on the show floor still needs to route through the same signature authority process as the original paperwork, so having that person reachable during show hours avoids a stalled request.

Frequently asked questions

Does North Carolina's right-to-work law mean union labor isn't available in Raleigh?

No. Union labor is available and used at Raleigh venues; the law simply means union membership isn't a condition of employment, so labor categories at the venue determine who can perform which task, not a blanket union-only requirement.

Where do I find the correct exhibitor service kit for a Raleigh show?

It comes from the specific venue hosting the show, either the Raleigh Convention Center or the relevant NC State Fairgrounds building, since each publishes its own kit with different forms and deadlines.

What happens if a certificate of insurance doesn't name the right additional insured party?

The venue can hold the booth at check-in until a corrected certificate is filed, so it's worth confirming the exact additional insured language required before submitting rather than after a rejection.

Are exhibitor kit deadlines the same across every Raleigh venue?

No, each venue sets its own deadline calendar tied to its own move-in schedule, so deadlines for the Convention Center and the fairgrounds buildings need to be tracked separately.

Who should be listed as the show's signature authority on the exhibitor paperwork?

Whoever is on-site and empowered to approve labor and change orders during move-in, ideally not someone traveling in the day of the show, since the venue needs a reachable point of contact for the whole build window.